48
Step 13 : Check SMPS P.C.B. according to the diagram shown.
9.2. Checking of FL P.C.B.
Step 1 : Remove Front Ornament Unit (L) & (R).
Step 2 : Remove Front Panel Block.
Step 3 : Remove NFC P.C.B..
Step 4 : Remove 2 screws.
Step 5 : Detach 14P FFC at connector (CN900) on Button
P.C.B..
Step 6 : Lift up FL P.C.B. and Button Ornament Unit.
Step 7 : Remove screw.
Step 8 : Release 5P wire from slots.