HY13-1597-01/US
3Z Motor Service Procedure
3ZG Series
Parker Hannin Corporation
Hydraulic Pump & Motor Division
Greeneville, TN 37745 US
18
Assembly
Line Up Alignment 
Marks
Install Rotor
Install Stator O-Rings
Install Stater
NOTE
Install Rotor Vanes
Figure38
Figure39
Figure36
Figure37
Makesurethealignmentmarks
onthehousingfaceandthe
drivelinkarealigned.(Figure36)
Reinstalltherotorontothedrive
link.Makesurethealignment
markontherotorarealigned
withthealignmentmarkonthe
drivelink.(Figure37)
InstalltheO-ringsintothestator
groove.(Figure38)
Installthestatorontothemotor
withtheO-ringfacingdown.
(Figure39)
Makesurethealignmentmarks
ontheoutsideofthemotorline
upinthecorrectdirection.
Replaceallnine(9)rollervanes
intothestator.(Figure40)
Figure40