18
Medium Flow Compressed Air Dryers - IOMI.
Warning
Only competent personnel trained, qualied, and approved by Parker Hannin should perform installation,
commissioning, service and repair procedures.
INSTALLATION AND COMMISSIONING
COMMISSIONING CHECK LIST
TASK PAGE COMMENTS
TICK WHEN
OK
Recommended System Layout
System Components / piping installation 19
Locating the Equipment
Installation Environment 20
Ensure adequate space for installation / maintenance 20
Mechanical Installation 20
Set purge for minimum inlet pressure 21
Electrical Installation
Dryer electrical connection 22
Commissioning - Controller Basic Installation
Congure Dewpoint Setpoint / ECO Setpoint / Dewpoint Alarm Setpoint 22
Congure Inlet Valve Conguration - Normally Open / Normally Closed 23
Congure Temperature Units to be Displayed - °C or °F 23
Commissioning - Controller Setup Advanced Installation
Remote Stop / Start Connection 25
Purge Economy Connection 26
Remote Alarm Connection - General Fault Alarm Relay 28
Remote Alarm Connection - Addition of a Dedicated Dewpoint Alarm Relay 29
4-20mA Dewpoint Retransmission 30
MODBUS Connectivity 32
MODBUS Strings 33
MODBUS Setup via ADS Software 34
Final Check
Pressurisation / Leak check N/A
Operation
Dryer start-up procedure 45
Monitor operation / performance
Troubleshooting (if required) 64
Installation and Commissioning Complete