EasyManua.ls Logo

PAT DS350 - Central Unit Preparation; Cable Assembly Installation; Grounding of Inner Shield

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Console Replacement Instructions
Central Unit Preparation
1
.
R
e
move existing console cable and strain relief from the central unit and install PG13.5 hole plug
using the existing nut. Remove existing PG11 hole plug. Install new PG11 strain relief using the
existing nut. (Fig. 13)
Cable Assembly Installation
1. Attach inner shield to grounding clamp on the
connection board per diagram. (Fig. 14 and 14a)
2. Install 1/8” and ¼" female terminals on wire
ends and attach to connection board and diode
ass’y per electrical schematic. (Fig. 16)
3. Reinstall central unit lid and any grounding wires
that apply.
Grounding of Inner Shield
Inner shield is grounded on connection board.
Cut inner shield back to approximately 1.2 inch. Then fold inner shield back to inner jacket, so the inner
shield is 0.6 inches in length.
Fig. 13
Fig. 14
Fig. 14a
SkyAzúl, Equipment Solutions
14
www.skyazul.com

Other manuals for PAT DS350

Related product manuals