EasyManua.ls Logo

PAT DS350 - Procedure 2. Console Cable Installation in Central Unit

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Console Replacement Instructions
PROCEDURE 2. CONSOLE CABLE INSTALLATION IN CENTRAL UNIT
1. Ensure console is properly installed in cab.
2. Route console cable assembly (031-300-060-697) to the central unit following the same path as the
existing console cable assembly. Cut the console cable to the appropriate length.
3. Wire the console cable assembly in central unit referencing the diagram. (Fig. 19)
4. Install the C.U. lid. Reinstall and any grounding and heater wires removed, then install the cover and
tighten screws, making sure the rubber gasket, is positioned correctly, to prevent any moisture from
entering the central unit.
Fig. 19
SkyAzúl, Equipment Solutions
17
www.skyazul.com

Other manuals for PAT DS350

Related product manuals