Provide a sound, level foundahon Locate boiler as
near to the chmney or outside v_ali as possLble and
cennahzed v_Jth respect to the heahng system
Locate boiler [n front of installation pos[hon before
_movll_g crate
If using combushble floor pan, poslhon pan on
foundat,on or flooring
4 Separate the wood shppmg pallet from the boiler
base by removing two (2) hold-down bolts at each
end of the boder base
5 Move boder into hnal poslhon If using combustLble
floor pan, install boder on pan as outhned ,n the
instructions included wlth the pan