EasyManua.ls Logo

Pentair FLECK PROFLOSXT DOWNFLOW - Job Specification Sheet

Pentair FLECK PROFLOSXT DOWNFLOW
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FLECK Model ProFloSXT Downflow Service Manual 3
JOB SPECIFICATION SHEET
Job Number: __________
Model Number: __________
Water Hardness: __________ppm or gpg
Capacity Per Unit: __________
Mineral Tank Size:
Diameter __________ Height: __________
Salt Setting per Regeneration: __________
1. Type of Timer:
A. 7 Day or 12 Day
B. Meter Initiated
B. Regenerant Flow:
A. Downflow
B. Upflow
C. Upflow Variable
3. Meter Size:
A. 3/4 inch Elec, Paddlewheel
B. 3/4 inch Elec, Turbine
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or Delayed
Regeneration
B. System #4: Time Clock
5. Timer Program Settings:
A. Backwash:__________Minutes
B. Brine and Slow Rinse:__________Minutes
C. Rapid Rinse:__________Minutes
D. Brine Tank Refill:__________Minutes
E. Pause Time:__________Minutes
F. Second Backwash:__________Minutes
6. Drain Line Flow Control: __________ gpg
7. Brine Line Flow Controller: __________ gpg
8. Injector Size#: __________

Related product manuals