EasyManuals Logo

Pfaff PowerLine 2231 Setup Instructions

Pfaff PowerLine 2231
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #35 background imageLoading...
Page #35 background image
35
7 Commissioning
Before commissioning the machine, it must be thoroughly cleaned and then
oiled., see chapter 9 Care and maintenance in the instruction manual.
Check the machine, particularly its electrical wiring and pneumatic tube
connections, for any damage.
Have skilled personnel check if the machine can be operated with the available mains vol-
tage.
Do not operate the machine if there is any discrepancy.
The machine may only be connected to an earthed socket!
In the case of machines with PicoDrive and P45 PD2-L control unit, have specialists
check the basic position of the machine drive before commissioning the machine (see
Chapter 7.02 Basic position of the machine drive).
7.01 Switching the machine on/off
Switch the machine on (see Chapter 7.01, On/off switch in the instruction manual).
Commissioning

Other manuals for Pfaff PowerLine 2231

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pfaff PowerLine 2231 and is the answer not in the manual?

Pfaff PowerLine 2231 Specifications

General IconGeneral
BrandPfaff
ModelPowerLine 2231
CategorySewing Machine
LanguageEnglish

Related product manuals