EasyManua.ls Logo

Philips WelcomeEye Connect 2 - Monitor Installation

Philips WelcomeEye Connect 2
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F7
WelcomeEye Connect 2 / Touch / V4
5) Using the badges:
To open the electric strike plate, quickly swipe your pre-programmed grey user badge on
the RFID reading eld. One short beep conrms the opening of the electric strike plate.
To open the gate motor, hold the badge in front of the RFID scan area for 3 seconds. Two
short beeps indicate that the gate is opening.
6) Replacing a badge
RFID badges do not have predened functions. It is the programming step that sets the
badge’s function. Badge colours simply enable users to recognize their functions. If a badge
is lost, it can be replaced by any other badge by repeating the programming step.
3. Installing the main or additional monitor
1m60
DES 9900 VDP
5 8 1 0 2 3
24V 550mA
+
-
1/3
2/4
WiĮ 2.4GHz
DES 9901 VDP
5 8 1 0 2 3
Made in P.R.C
Avidsen
19 avenue Marcel Dassault
37200 TOURS
FRANCE
1 2
4
7
5 6
3
1 - Position the wall bracket so that the screen of the monitor is approximately 1.60m above
the ground.
2 – Mark the location of the holes using the U bolt.
3 – Drill.
4 – Use pegs adapted to the bracket (those supplied are suitable for solid walls).
5 - Attach the wall bracket.

Other manuals for Philips WelcomeEye Connect 2

Related product manuals