EasyManua.ls Logo

Plessey PRC 320/1 - Functional Checks; Ancillary Equipment

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER
FIVE
CORRECTIVE
MAINTENANCE
AND
FUNCTIONAL
CHECKS
GENERAL
5.1
The
procedures
outlined
in
this
chapter
are
to
be
followed
when
checking
the
RT320/1
and
its
ancillary
equipment.
These
checks
are
to
be
carried
out
as
part
of
the
preventive
maintenance
given
in
Chapter
Four
or
in
the
event
of
equipment
failure.
They
are
designed
to
enable
an
operator
to
prove
quickly
that
the
equipment
is
functioning
correctly
or
to
localise
the
fault
if
it is
not.
Тһе
following
points
are
to
be
observed
а%
all
times:-
5.1.1
The
operator
is
not
to
open
sealed
equipment
under
any
circumstances.
5.1.2
The
equipment
is
not
normally
to
be
removed
from
its
parent
installation
in
order
to
perform
maintenance.
5.1.5
The
user
is
only
to
take
remedial
action
where
this
is
stated
to
be
specifically
within
his
capability.
5.1.4
The
user
is
not
to
make
adjustments
or
replace
items
unless
he
сап
make
a
confirmatory
test.
FUNCTIONAL
CHECKS
5.2
When
carrying
out
the
functional
checks
following,
it
is to
be
ensured
that
the
equipment
has
been
correctly
set
up
and
is
being
operated
in
accordance
with
the
operating
information
given
in
Chapter
Two
(page
20).
55