PMDG 737NGX 0.00.61
TUTORIAL #2
For Simulator Use Only DO NOT DUPLICATE 27FEB15 RTM
The start sequence takes about 30 seconds to complete. Monitor
the APU EGT temperature on the round gauge – it should initially
spike up to around 800 degrees and then settle back down to
around 400.
The LOW OIL PRESSURE light will illuminate during the initial
EGT rise – this is normal.
As soon as the blue and white APU GEN OFF BUS light on the
lower overhead electrical panel illuminates, the APU is ready for
use.
Left click both APU generator switches.
This transfers electrical power from ground power to the APU
generators.
o Verify that the SOURCE OFF and TRANSFER BUS OFF
lights are extinguished.
Back to the central lower overhead.