EasyManua.ls Logo

PMDG 737NGX - Page 61

Default Icon
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PMDG 737NGX 0.00.61
TUTORIAL #2
For Simulator Use Only DO NOT DUPLICATE 27FEB15 RTM
The start sequence takes about 30 seconds to complete. Monitor
the APU EGT temperature on the round gauge it should initially
spike up to around 800 degrees and then settle back down to
around 400.
The LOW OIL PRESSURE light will illuminate during the initial
EGT rise this is normal.
As soon as the blue and white APU GEN OFF BUS light on the
lower overhead electrical panel illuminates, the APU is ready for
use.
Left click both APU generator switches.
This transfers electrical power from ground power to the APU
generators.
o Verify that the SOURCE OFF and TRANSFER BUS OFF
lights are extinguished.
Back to the central lower overhead.