0.00.130 PMDG 737NGX
TUTORIAL #2
27FEB15 RTM DO NOT DUPLICATE For Simulator Use Only
ELECTRICAL POWER DOWN
The final step that will actually put the aircraft into a cold & dark state is
the Electrical Power Down procedure, which is located in FCOM 1’s
Supplemental Procedures section on page SP.6.4 (page 212 of the PDF
version).
Verify that both the APU and GRD POWER switches are OFF.
Ensure that at least 2 minutes has elapsed since the APU was turned off
during the Shutdown Procedure before continuing.
Set the overhead BATTERY switch to OFF.