10
2
7
7
PUSH
2
10
12
5
ALIGN
10
9
2
5
8. Remove the Sand Guard and save for future use.
6
10. Apply the Clamp to the flange of the 6-Port Valve
and Sand Tank .
7
2
10
11. Close the Clamp push the 2 jaws as close together as possible.
7
6
9. Place the 6-Port Valve to the Sand Tank . Make sure the 6-Port
Valve O-Ring is present at the bottom flange of the 6-Port Valve
. Make sure the center tube extending from the valve fits securely
with the Center Pipe . Rotate the 6-Port Valve so that the
Pressure Gauge is facing the same direction as the Drain Valve.
10
10
10
12
5
9
2
11
OWNER’S MANUAL