INSTALLATION GUIDE
HEADER INSTALLATION
Mount the pre-drilled back-plate to the top door frame using appropriate fasteners for the type of frame.
(Refer to Door Prep drawings on pgs. 8-13.)
§ Push side mounting: Pre-drilled back-plate is flush with bottom of door frame.
§ Pull side mounting: Pre-drilled back-plate is mounted 1.5” up from bottom door frame.
§ Back-plate should overlap each jamb tube by 1.5”.
§ Refer to the APPENDIX for fire rated door applications.
PUSH ARM APPLICATIONS:
Bottom of swing unit is flush with bottom of top
door frame.
NOTE:
PORTALP is now using a 35mm spindle adaptor
for all standard push arm applications – this
requires that the header assembly be mounted
as shown at left, flush with bottom of top door
frame.
PULL ARM APPLICATION: STANDARD PULL ARM
& DOUBLE EGRESS APPLICATIONS
Double egress applications require the use of an
80mm spindle adaptor for the side using the
push arm.