MAINTENANCE
CHAPTER 3 MAINTENANCE
3-1 Maintenance schedules
Keeping your generator well maintained will prolong the life of your generator.
Everything needs to be checked including the diesel engine, generator, control
cabinet, and frame. For overhauling procedures, please refer to the instruction
manual of the relative subassembly. If you need these manuals, please call our
company and we will send you one.
Before starting the maintenance, make sure the diesel engine is off.
Please refer to the Table 3-1 for the proper maintenance schedule.
Table 3-1. Maintenance schedule for diesel generator set
Note: the quality period of the injector and injection pump is 1500 hours
or two years. There into,● means it should operate with special
tools, or can be checked by dealer.