8 9
3
rd
step: Make sure the gate leaf does not get stuck in opening and closing move-
ments. The gate sliding rail must be perfectly straight, level, and periodically clear
of any element or dirt that makes it dicult for the pulleys to slide along its entire
length, as shown in the gure below.
OPERATOR INSTALLATION AND
FASTENING
Before installing the operator, remove all unnecessary cables and disable any
equipment or systems connected to the electrical network.
EQUIPMENT DIMENSIONS
The perfect operation of this equipment depends on the instructions in this manu-
al. To install the equipment, proceed as follows:
1
st
step: Check if the oor is rm enough so the equipment can be fastened and
leveled; otherwise, provide a concrete base, following the guidelines below:
2
nd
step: The base dimensions must be appropriate for the operator dimensions.
The concrete base should be at a distance of approximately 20 mm from the gate
leaf face.
3
rd
step: Once the concrete base conditions are met, open the gate and position
the operator close to the gate leaf. The distance between the gate leaf end and the
concrete base must be 50 mm.
GATE LEAF
SIDE VIEW
CONCRETE BASE
20mm
GATE LEAF
50 mm