14 15
2
nd
step: Fully open the gate and place the other magnet bracket on the rack, fac-
ing the operator’s REED. This magnet will act as the opening limit switch.
3
rd
step: Start the motor and check if the REEDs are shutting down correctly. If
necessary, reverse the plate connector. After xing the magnet brackets, make the
nal adjustments, moving them to the right or left, down or up, according to the
desired adjustment.
4
th
step: To complete installing the operator and before its operation, it is manda-
tory to screw the cover with 2 3.5 x 16 mm screws (available in the kit).
GATE OPENING
MAGNET BRACKET
REED SUPPORT
TOP VIEW
SUPPORT
ADJUSTMENT
SUPPORT
ADJUSTMENT
MAGNET
BRACKET
RACK