EasyManua.ls Logo

Pregis AIRSPEED 5000 - Operating Procedure; Start-Up; Film Web Thread-Up

Pregis AIRSPEED 5000
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING PROCEDURE
PREGIS AIRSPEED 5000
AIR CUSHION MACHINE
Start-Up
Electric shock hazard. DO NOT open
cover. Do not touch moving components.
Failure to heed may result in injury.
1. Slide the roll of film, with the unsealed air
tube slot to the inside, over the shaft. The
inside of the core is gripped by the shaft
plungers.
2. Route the film web around the bottom of the
film roller. See Figure 1.
3. Slide the unsealed edge slot of the film over
the air injection tube, up to the outfeed nip
(first) rubber rollers.
4. If not already closed, turn nip Open/Close lever
to close the tape drive nips.
NOTE: Jogging the film will not initiate infla-
tion.
5. Touch the JOG button until the end of the film
is fed through the sealing section, slitter, out-
feed end nip and belt rollers.
The film has a tendency to bunch up on the
slitter blade. The film must be pulled through
the machine by hand while pressing the JOG
button.
NOTE: Refer to the Operator Controls instruc-
tion for touch screen operation.
Figure 1
Film Web Thread-Up

Related product manuals