EasyManua.ls Logo

PSG MAX CADDY - Page 15

Default Icon
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Now, it is time to make the connection between the control PCB and the blower. Since the control PCB may be
installed on either side of the furnace, refer to the drawings below to run the wire properly.
Control PCB installed on the RIGHT side of the furnace
Control PCB installed on the LEFT side of the furnace

Table of Contents

Related product manuals