EasyManua.ls Logo

PVR EU 105 - Transport;Handling; Lifting; Unpacking and Components Control; Storage

PVR EU 105
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating and maintenance instructions
EN
8
LI 2246.03
4. Transport/handling
4.1 Lifting
The orientation of the packed components must correspond to the instructions given
by the pictograms on the external covering of the packaging.
For unloading use a lifting equipment suitable for the pump weight.
For lifting the packaging and the pump, please refer to the figures here below.
Pump packaged (Figure 0)
Pump with motor (Figure 1).
Pump without motor (Figure 1).
4.2 Unpacking and components control
When receiving the machine, check that the packing is intact or if is shows signs of
damages occurred during transportation.
If there is no damage, proceed to the unpacking and check further the machine.
In case damages are found, inform immediately P.V.R. and the carrier. A representative
will contact you or it may be dispatched to the site to inspect and file full damage report.
4.3 Storage
The pumps must be stored or transported without oil and protected from the atmospheric
agents at a temperature between -15°C and 70°C (normal humidity rate max. 95% non
condensing).
Fig.0
L
B
H
L HB
Packing size
928 mm 505 mm400 mm
EU 105
Pump Packaged pump
Weight of the pump with motor 50Hz
85 Kg
89 Kg
62 Kg
100 Kg
100 Kg
77 Kg
Weight of the pump with motor 60Hz
Weight of the pump without motor
Fig.1

Related product manuals