EasyManuals Logo

Qrotech OPA-101 User Manual

Default Icon
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
OPA-102/101
OPERATION MANUAL
- 11 -
SECTION 5. INSTALLING METHOD
5-1 Installing Method.
Connect all of cables to the correct port each other on the side of measurement unit.
And connect the probe hose on the rear of the measurement unit. Move the ON/OFF
switch to “ON” position. Then OPA-102 will be start.
Handheld terminal
The handheld terminal is operated together with the display of the measurement
at the same time. (Power ON/OFF: Press the ON/OFF switch for 3 seconds.)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Qrotech OPA-101 and is the answer not in the manual?

Qrotech OPA-101 Specifications

General IconGeneral
BrandQrotech
ModelOPA-101
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals