DP Series
EN
B
1C
A
B
C
2C
Nm
8÷10
45°
40 cm (16”)
QUICK DPSeries INSTALLATION AND USER’S MANUAL - REV000A
10
4 - Installation
4.1 - Installation procedures
A Identify the ideal position and drill the holes using the drilling template supplied.
BRemovetheexcessmaterialfromtherope/chainpassagehole,nishitandsmoothitwithaspecicproduct(marinepaint,
epoxy resin or gel) ensuring the free passage of the chain.
C Position the upper section inserting the gasket between the deck and the base, and connect it to the lower section inserting
theshaftintothegearbox.Fixthewindlassbyscrewingthenutsontothexingstuds.
Connect the supply cables from the windlass to the reversing contactor unit.
STUD
B DECK LEVEL
Ensure that the upper and lower surfaces of the deck are as
parallel as possible. If this is not the case, compensate the
differenceappropriately(g.B).
A lack of parallelism could result in a loss of motor power.
Thedeckthicknessmustbeincludedamongthegureslisted
in the table.
In case of different thickness, please contact your Quick
®
dealer.
C PEAK DEPTH AND BOW ROLLER HEIGHT
Theremustbenoobstaclestothepassageofcables,ropeandchainunderdeck(g.1C).
Insufcientdepthofthepeakcouldcausechainjamming(g.2C).
Apositivetiltofthechaininrelationtothedecklevelofupto5°isallowed(g.1C).
Anexcessivenegativetiltofthechaincouldinterferewiththewindlassbase(g.2C).
Max
5 mm (3/6”)
GASKET
FLANGE GASKET
TOP GEARBOX
NUT
GROWER