3 4
1 2
1. Turning o the tank
Turn o the tank. Leave the plug in the
socket. Open the boiling water tap and
let the water run cold. Also open the cold
water tap. Close the inlet combination rst,
and then the tap. Then turn o the mains
cold water supply.
2. Removing the copper pipe
Remove the copper pipe, including the
nuts and clamping rings, between the
T-piece and inlet combination.
3. Mounting the inlet combination
Mount the push-t using the insert on the
pressure reducing valve. Then connect
one of the two plastic tubes (B) to the
push-t.
4. Mounting the bracket
Screw the bracket onto the kitchen
cabinet wall using the two long screws
provided.
D
1
Installation with a PRO3 or PRO7
• Follow the steps below to install the Scale Control Plus with a Quooker PRO3 or PRO7.
• The ‘Q’ on the top of the tank is the on / o switch.
COLD
COLD