9
Recommendation for protecting devices and cable specification
※ Above data is subject to modification without notice.
Note: The above data is adapted to power cord ≤ 10 m .If power cord is >10 m, wire
diameter must be increased. The signal cable can be extended to 50 m at most.
Trial after first installation
Inspection before connecting power supply
- Check the installation of the whole machine and the pipe connections according to the
pipe connecting drawing.
- Check the electric wiring according to the electric wiring diagram, and ground well.
- Make sure no blockage on the air inlet and outlet, or the efficiency of the heater will be
reduced or cause machine to stop operation.
Trial after connecting power supply
- Connect the machine with electric power supply, then relative information will display on
the LED controller.
(For Detail operation of LED controller, please refer to Chapter “Operation guide”.)
- Start the water pump before turning on the Machine to avoid any damage.
- Press power on/off on LED controller to turn on/off machine.
- During the first start of machine, please check if there is any water leakage in the piping
connection system. Then set suitable temperature.