4
2. MOUNTING AND INSTALLATION
Mounting the Thermostat
The installation of the Green Leaf must be performed by a qualified installer. The Green Leaf is
a thermostat with protection class IP20, make sure to comply with all local regulations when
installing the thermostat. Green Leaf is intended for flush mounting in a wall box. It should be
positioned approximately 1.5 meters above the floor, protected from direct sunlight and draughts.
All electrical conduits passing into the wall box that contain cables must also be sealed to protect
the thermostat against draughts, e.g. with a piece of insulation in the conduit outlet.
Step 1: Switch off the power supply
Step 2: Detach the metallic support from the Thermostat using a screwdriver
Step 3: Screw the metallic support frame to the in-wall box