EasyManua.ls Logo

Raypak B6000 - Installation Verification

Raypak B6000
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION VERIFICATION PROCEDURE
REGISTER
Before proceeding any further, please verify that the user registration form has been
completed and mailed (reference: Registration Card ).
MECHANICAL INSTALLATION
Verify installation has been completed (reference: Mechanical Installation ).
AIR TEMPERATURE SENSOR
Verify installation parameters have been met (reference: Air Temperature Sensor).
WATER TEMPERATURE SENSOR
Verify installation parameters have been met (reference: Water Temperature Sensor).
Verify System Control/Boiler Monitor power wiring connections.
Verify Torque Requirements.
Verify Air Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.
Verify Water Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.
Verify Power Test has been completed successfully.
Verify RS485 Communications Cable, must be Belden #9842 or equivalent.
Verify Boiler Monitor Select Switch (SW2) settings.
Verify Installation/Removal of Boiler Monitor Communications Jumper(s) [W1].
Verify Optional Boiler Monitor Control Wiring.
MODEM (Optional)
Perform and/or verify modem installation and hook-up per Raypak Add/On Options
P/N 240596 and B6000 BMS Optional Modem Software Documentation P/N 240595.
Page 20

Related product manuals