EasyManua.ls Logo

Raytheon Beech Baron E55 - Page 379

Raytheon Beech Baron E55
903 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ci3eechcraft
BARON
55
AND
58
SHOP
MANUAL
b.
Connect
the
oil
line
to
the
transmitter.
f.
Connectthe
fuel
supply
line
to
the
fuel
manifold
valve.
c.
Connect
the
electrical
wires
to
the
transmitter.
d.
Start
the
engine
in
accordance
with
the
applicable
9´•
I"stallthe
upperenginecowl.
Pilot’s
Operating
Handbook
and
check
for
oil
leaks.
NOTE
e.
Shut
down
the
engine.
Position
the
fuel
line
to
the
fuel
manifold
f.
Install
the
heat
shield
on
the
bottom
of
the
engine
valve
before
connecting
the
flexible
blast
nacelle.
duct
from
the
fuel
metering
valve.
AIR
BOX
REMOVAL
(Effectivity:
TC-I
and
AIR
BOX
REMOVAL
(Effectivity:
TE-I
and
after)
after
and
TH-1
and
after)
a.
Remove
the
upper
engine
cowl.
a.
Remove
the
upper
engine
cowl.
b.
Disconnect
the
fuel
supply
line
to
the
fuel
manifold
b.
Remove
the
flexible
duct
from
the
air
scoop
duct.
valve,
c.
Remove
the
rod
end
from
the
flapper
valve
arm
c.
Disconnect
the
blast
tubes
to
the
generator
or
assembly.
alternator,
fuel
metering
valve,
and
the
fuel
pump
at
d.
Disconnect
the
brace
on
the
forward
side
of
the
the
air
box.
metering
valve
assembly
and
remove
the
angles
(two)
d.
Remove
the
screws
securing
the
air
box
to
the
from
the
mounting
bolts.
engine
baffle
and
the
aft
brace
to
the
air
box.
e.
L~OSBn
the
tier
dun
clamp
and
remove
the
air
I
e.
Remove
the
four
nuts
attaching
the
air
box
to
the
metering
valve
assembly.
f.
Disconnect
the
bracket
on
the
forward
side
of
the
AIR
BOX
INSTALLATION
(Effectivity:
TE-
I
metering
valve
assembly
and
remove
angles
(two)
and
after
and
TH-1
and
after)
from
mounting
bolts.
a.
Install
the
air
box
to
the
flex
duct
and
tighten
the
I
g.
Remove
the
air
box.
clamp.
b.
Install
the
angles
(two)
on
the
mounting
bolts
and
A/R
BOX
INSTALLATION
(Effecfivity:
TC-I
connect
the
brace
on
the
forward
side
of
the
metering
and
after)
valve
assembly.
a.
Position
the
air
box
for
installation.
c.
Install
the
rod
end
in
the
flapper
valve
arm
assem-
b.
Install
the
angles
(two)
on
the
mounting
bolts
and
bly
connect
the
brace
to
the
forward
side
of
the
metering
d.
Connect
the
flexible
duct
to
the
air
scoop
duct.
valve
assembly,
e.
Install
the
upper
engine
cowl.
NOTE
ENGINE
CONTROLS
ADJUSTMENT
On
serials
TC-1714
and
after
and
prior
airplanes
having
complied
with
Service
THROTTLE
AND
MIXTURE
(Etfectivity:
TC-1
thru
Instructions
No.
0688-258,
tighten
the
TC-97)
four
air
box
nuts
only
until
a
positive
seal
is
created
between
the
throttle
body
and
On
airplanes
that
are
equipped
with
the
original
con-
the
air
box,
trols,
the
following
adjustment
may
be
made
to
the
engine
throttle
or
mixture.
c.
Install
the
four
nuts
attaching
the
air
box
to
the
air
metering
valve
assembly.
a.
Remove
the
glareshield
to
gain
access
to
the
con-
d.
Install
the
screws
securing
the
air
box
to
the
eng-
t’01
assembly.
ine
baffle
and
aft
air
box
brace.
b.
Remove
the
two
screws
securing
the
upper
por-
e.
Connect
the
blast
tubes
to
the
generator
(or
alter-
tion
of
the
instrument
panel
and
ti~
the
panel
aft.
nator),
fuel
metering
valve,
and
fuel
pump
at
the
air
c.
Disconnect
the
control
lever
from
the
rod
end
on
box.
the
control
assembly
adjustment
mechanism.
6-6
515

Table of Contents

Related product manuals