EasyManua.ls Logo

RedMax GZ25N - 6-14 Positioning of Lead Air Intake Tube

RedMax GZ25N
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
STRATO CHARGED ENGINE
GZ25N
6. SERVICE GUIDE
6-15 Assembling of Cylinder Plate
Anotchonthecylinderplateistolaythehighten-
sioncable.
Setthecylinderplatewiththenotchatthemuffler
side.
6-14 Positioning of Lead Air Intake Tube
Theleadairintaketubehascastmarkingofeither
ForS.
Sisforthestarterend,andFforthefanend.
Assemblingpositionshallnotbemixedup.
Caution:
Oppositely assembled tubes will cause a sealing failure.
Before assembling the tubes, check for deterioration or
cracks and change with new ones if necessary.
Marks
Leadairintaketube
6-16 Setting of Insulator Gasket
Settheinsulatorgasketundertheenginecoverwith
carefornotturningitupbytheenginecover.
InsulatorGasket
Mufflerside
Notch
CylinderPlate