1) When selecting a location for your replace,
ensure that the clearances are met as outlined
in the "Clearances" section.
2) Provide adequate clearances for servicing.
3) The appliance must be installed on a at,
solid, continuous surface (e.g. wood, metal,
concrete). This may be the oor, or raised up
on a platform to enhance its visual impact.
If the appliance is going to be installed on
carpeting, combustible linoleum tile or other
combustible material other than wood ooring,
the appliance must be installed on a metal or
wood panel extending the full width and depth
of the appliance.
4) The Direct Vent Gas Fireplace can be installed
as follows:
Model # Position
A) P121-10: See Thru
B) P131-10: Pier
5) This appliance is Listed for bedroom
installations when used with a Listed Millivolt
Thermostat. Some areas may have further
requirements, check local codes before
installation.
6) The P121-10/P131-10 Direct Vent Gas
Fireplace is approved for alcove installations,
which meet the clearances listed on this page.
7) We recommend that you plan your installation
on paper using exact measurements for
clearances and oor protection before actually
installing this appliance. Have a qualied
inspector, dealer, or installer review your plans
before installation.
Note: For Exterior Vent Termination
Locations see section "Exterior Vent
Termination Locations."
A) P121-10 See Thru
B) P131-10 Pier