EasyManua.ls Logo

REITEL INDURET COMPACT - Installation; Protective gas connection

REITEL INDURET COMPACT
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Pls. pay attention to the maximum percentage part of old material and crush
sufficiently! The parts have to be positioned on the crucible’s base, otherwise
there will be no or only partly metal melting.
3 Installation
In order to minimize casting time, the INDURET-COMPACT should be installed very near to
the preheating furnace.
Don’t install the device in a dusty room, e.g. near a sandblaster.
The INDURET-COMPACT is a benchtop unit. Ensure a stable placement on the benchtop
and leave enough space around the machine.
Pls. check connectivity with type plate indications.
In case of differences of power requirements in your location, we recommend the usage of
the following devices:
Connecting Medium
Remedial action
Order
-
No.
Compressed air Maintenance unit 23809
Compressed air Pressure equalization tank 26806
Cooling water Refrigeration by circulation 23807
3.1 Protective gas connection
Left side of the machine (25)
Connecting
medium
max. distance
Laboratory installation
Protective gas
Argon 4.6
Quick coupling NG 7,
hose with 8 mm flow
opening
2m
bottle:
pressure minimizer 5-6
bar (not l/min)
NG: quick-action coupling, possibly adjustment to your plug connection
(pls. ask your plumber or specialised dealer)
The gas cylinder is connected via a pressure minimizer.
Warning: This machine must not be operated by persons who wear a pacemaker.