EasyManua.ls Logo

Respironics Millennium - Page 48

Respironics Millennium
48 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RESPIRONICS"
Chapter
5:
Verification
Procedures
System
Pressure
Test
(Continued)
Step
7
Confirm
that
the
peak
of
each
cycle
is
within
the
operat-
ing
pressure
of
27
+
2
psig
for
normal
operation.
Con-
firm
that
all
peaks
are
within
1
psig
of
each
other.
NOTE:
If
the
four
cycles
are
not
within
specification,
proceed
to
Section
7.3,
System
Pressure
Test
Table,
for
diagnostic
information.
Step
8
Disconnect
the
pressure
gauge,
“T”
fitting,
and
tubing.
Reconnect
the
yellow
tubing
to
the
fitting
on
the
top
of
the
sieve
canister.
Step
9
Install the
front
and
rear
cabinets
(see
Sections
8.4.4
and
8.4.5 for
more
detailed
instructions).
1002403
Millennium
Oxygen
Concentrator
System
Service
Manual
5-6

Related product manuals