NOTE: STEPS 5 - 7 SHOWN WITH FURNACE IN DOWNFLOW ORIENTATION
ST-A1194-34-01
ROTATE
UNIT 180°
5
RELOCATE JUNCTION BOX AND DOOR SWITCH
SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS
REMOVE KNOCKOUTS
DRILL (2)
Ø 1/8" HOLES
IN BLOWER
SHELF
DRILL (3) 1/8" HOLES
IN JACKET
5a
5b
5c
5d
5e
5a - ROTATE UNIT 180°
5b - REMOVE KNOCKOUTS WITH HAMMER AND FLAT HEAD SCREWDRIVER.
5c - PRE-DRILL (2) Ø 1/8" HOLES IN BLOWER SHELF AS SHOWN FOR FLUE PIPE ASSEMBLY.
5d - PRE-DRILL (3) Ø 1/8" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP.
5e - THE JUNCTION BOX WILL HAVE TO BE RELOCATED FOR FLUE PIPE INSTALLATION
NOTE: SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS.
DISCARD
INSTALL
4b
4a
4c
4
4a - RE-INSTALL ELBOW AND COUPLINGS (FROM STEP 1)
IN THE ORIENTATION AS SHOWN.
4b - REMOVE Ø .403" DRAIN PLUG FROM ELBOW DRAIN
PORT - DISCARD.
4c - INSTALL 1/2" VINYL CAP (YELLOW) ON INDUCER COUPLING.
NOTE:LEAVE COUPLING CLAMP CONNECTIONS LOOSE UNTIL STEP 10.
3
INSTALL HOSE G ON COLLECTOR BOX AS SHOWN.
NOTE: LET THE OPEN END HANG FREE UNTIL STEP 10.
IF THE IDB COUPLING IS REMOVED, IT MUST BE REPLACED IN THE
PROPER ORIENTATION. AN ARROW IS PRESENT ON THE COUPLING
TO INDICATE THE DIRECTION OF EXHAUST FLOW. MAKE SURE THE
ARROW POINTS IN THE CORRECT DIRECTION.
NOTE: