EasyManua.ls Logo

Rheem RA1418AJ1NA User Manual

Rheem RA1418AJ1NA
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AIR COOLED
CONDENSING UNITS
92-104921-09-07 (5/16)
Printed in USA
[ ] indicates metric conversions.
Do not destroy this manual.
Please read carefully
and keep in a safe place
for future reference by a
serviceman.
WARNING
THESE INSTRUCTIONS
ARE INTENDED AS AN AID
TO QUALIFIED, LICENSED
SERVICE PERSONNEL FOR
PROPER INSTALLATION,
ADJUSTMENT, AND
OPERATION OF THIS
UNIT. READ THESE
INSTRUCTIONS
THOROUGHLY
BEFORE ATTEMPTING
INSTALLATION OR
OPERATION. FAILURE
TO FOLLOW THESE
INSTRUCTIONS MAY
RESULT IN IMPROPER
INSTALLATION,
ADJUSTMENT, SERVICE,
OR MAINTENANCE
POSSIBLY RESULTING IN
FIRE, ELECTRICAL SHOCK,
PROPERTY DAMAGE,
PERSONAL INJURY, OR
DEATH.
INSTALLATION INSTRUCTIONS
(-)A13, (-)A14 & (-)A16 MODEL SERIES –
13, 14 & 16 SEER
WARNING:
RECOGNIZE THIS SYMBOL
AS AN INDICATION OF
IMPORTANT SAFETY
INFORMATION
ST-A1226-01-00
FEATURING INDUSTRY STANDARD
R-410A REFRIGERANT
earth friendly refrigerant
e
ar
t
h
r
y r
dly
dl
e
n
i
fr
h
NOTE: Actual unit appearance
may vary.

Table of Contents

Questions and Answers:

Rheem RA1418AJ1NA Specifications

General IconGeneral
RefrigerantR-410A
Voltage208/230V
Phase1
HSPF RatingNot Applicable
Frequency60 Hz
Power Supply (V/Hz)208/230V, 60Hz
TypeAir Conditioner
Cooling Capacity18000 BTU/h
SEER Rating14 SEER
Energy Efficiency Ratio (EER)11.5 EER

Summary

Safety Information

Safety Warnings and Cautions

Covers critical warnings and cautions for safe installation and operation.

General Information

Electrical and Physical Specifications

Provides detailed electrical and physical data for various unit models.

INSTALLATION

Outdoor Unit Location Selection

Guidance on selecting the optimal placement for the outdoor unit, considering operational and environmental factors.

Tools and R-410A Refrigerant

Lists necessary tools and provides specifications and guidelines for R-410A refrigerant.

Interconnecting Tubing Installation

Instructions for installing tubing between indoor and outdoor units, including refrigerant level adjustment.

Refrigerant Tubing Installation

Guidelines for installing refrigerant tubing, including material, sealing, and insulation requirements.

Tubing Connections

Instructions for making proper tubing connections using specified alloys and techniques.

Line Set Leak Testing

Steps for pressurizing the system with nitrogen and checking for leaks using soap bubbles.

WIRING

Control Wiring and Thermostats

Details on low-voltage wiring, thermostat requirements, and wire sizing for control circuits.

Power Wiring and Grounding

Instructions for connecting power wiring and ensuring proper grounding for electrical safety.

START-UP

Initial Start-Up Procedures

Steps to take before initial compressor start-up, including ensuring crankcase heater operation.

System Evacuation and Leak Testing

Critical steps for evacuating the system and performing final leak checks to ensure system integrity.

Checking Refrigerant Charge

Procedures for checking and adjusting refrigerant charge using charts, airflow, and measurement devices.

Refrigerant Charging Procedures

Methods for performing gross charging by pressure and final charge adjustment using subcooling.

DIAGNOSTICS

WIRING DIAGRAMS

Related product manuals