20063692
16
Installation
5.9 Gas feeding
5.9.1 Gas feeding line
Key (Fig. 13)
1 Gas input pipe
2 Manual gate (the responsibility of the installer)
3 Gas pressure gauge (the responsibility of the installer)
4Filter
5 Gas pressure switch
6 Safety valve
7 Pressure stabiliser
8 Adjustment valve
M1 Gas-supply pressure test point on the pressure switch
M2 Pressure coupling test point
5.9.2 Gas train
Approved according to standard EN 676 and provided separately
from the burner. Supplied separately for its adjustment, see the
enclosed instructions.
The train-burner combination is indicated in Tab. C.
Tab. C
Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure the fuel interception tap is closed be-
fore performing any operation on the burner.
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
Fig. 13
D5069
M2
1 2 3 M1 4 5 6 7 8
Code Model
Connections
Use
Gas train Burner
3970530 MB 405/1 - RSD 20 Rp 1/2 Rp 3/4 Natural gas 80 kW and LPG
3970531 MB 407/1 - RSD 20 Rp 3/4 Rp 3/4 Natural gas and LPG