EasyManua.ls Logo

Riello RS 70 - Test Boiler; Commercial Boilers

Riello RS 70
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
20144609
GB
Technical description of the burner
4.9 Test boiler
The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the manufac-
turer.
The firing rates were set in relation to special test boilers, accord-
ing to EN 676 regulations.
In Fig. 3 you can see the diameter and length of the test combus-
tion chamber.
Example:
Output 756 kW: diameter = 60 cm; length = 2 m.
4.9.1 Commercial boilers
The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be used with a commercial boiler that has not
been EC approved and/or its combustion chamber dimensions
are clearly smaller than those indicated in the diagram (Fig. 3),
consult the manufacturer.
Fig. 3
Combustion chamber
m
D715

Table of Contents