COMMISSIONING
GAS PRESSURE SETTING
The regulator is electronically controlled and factory pre-set. Under normal circumstances it does not
require adjustment during installation.
Make adjustments only if the unit is not operating correctly and all other possible causes for incorrect
operation have been eliminated.
Instructions for Gas Pressure Setting are to be found in the instruction pocket located inside the
appliance front cover.
COMMISSIONING CHECK LIST
A commissioning check list is provided on the appliance front cover to enable the installer to step
through the correct commissioning procedure when installing a Rinnai Continuous Flow water heater.
The check list can also assist the installer to identify potential installation errors that may prevent the
appliance from operating correctly.