4|NeoRIB2312installationguide:12148-D04-19
Checklist
Engine: Masonry installations
1. Rinnai Neo heater (engine)
2. Outer frame (standard or classic)
3. Glass outer dress guardstandard frame
Mesh dress guardclassic frame (inbuilt models)
4. Inner frame
5. Log set and granule pack (inside appliance)
6. Semi rigid stainless steel gas pipe
7. Flared brass adaptor “ UNF - ½ “ BSPT
8. Foam sealing strip
9. Operation and installation guides
Standard
frame
Classic
frame
12
2
3
4
5
5
6
7
8
3
9
Inbuilt mock chimney installations
A. Engine set (see above)
1. Spigot adaptor
2. Spigot guide panel
3. Spigot guide rails
4. Zero clearance box top panel
5. Zero clearance box rear panel
6. Zero clearance box left and right panels
7. Zero clearance box base panel
8. Hardware pack
A
3
7
2
1
8
5
6
4
Freestanding console installations
A. Engine set (refer masonry installation)
1. Spigot adaptor
2. Console top panel
3. Console right side panel
4. Console left side panel
5. Console rear panel
6. Console pillar
7. Hardware pack
1
A
3
2
7
4
5
6
Freestanding plinth installations
A. Engine set (refer masonry installation)
1. Spigot adaptor
2. Plinth top panel
3. Plinth right side panel
4. Plinth left side panel
5. Plinth rear panel
6. Plinth pillar
7. Plinth base
8. Hardware pack
1
A
3
2
4
5
6
7
8
Infra-red remote control
Infra-red remote control (batteries inserted).
Remote comes as standard and will come with
the Neo engine.
23