MAINTENANCE BOOK
INITIAL TEST
Floor consistency check
1
DESCRIPTION TEST
N.
YES
NO
Notes
Safety distances check (from walls, columns,
ceiling, other machines etc.)
2
Power supply line check.
3
Lift levelling check.
4
Lift working check.
5
Loaded lift check.
6
Lift fixing check.
7
Oil level check.
8
Hydraulic failure check.
9
Operating instruction
10
NOTES:
Client
Stamp and signature
Installer
Stamp and signature
Date Next test on:
KONTROLL AV GOLVETS BELASTBARHET
1
BESKRIVNING AV TEST
Nr.
JA
NEJ
ANM.
KONTROLL AV AVSTÅND MELLAN LYFT, VÄGGAR,
TAK, ANDRA MASKINER OCH LIKNANDE
2
KONTROLL AV ELANSLUTNING
3
KONTROLL AV ATT LYFTPLATTORNA
LYFTER PARALLELLT
4
FUNKTIONSKONTROLL AV LYFTEN
5
FUNKTIONSKONTROLL MED BELASTNING
6
KONTROLL AV LYFTENS FASTSÄTTNING
7
KONTROLL AV OLJENIVÅ
8
KONTROLL AV TÄTHET I OLJEKRETSEN
9
BRUKSANVISNING
10
UNDERHÅLLSINSTRUKTIONER
KONTROLL EFTER MONTERING
NOTERINGAR:
Kund:
Stämpel och underskrift
Installatör:
Stämpel och underskrift
Datum Nästa test skall göras:

Other manuals for Rotary GEMINI GLP 30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotary GEMINI GLP 30 and is the answer not in the manual?

Rotary GEMINI GLP 30 Specifications

General IconGeneral
BrandRotary
ModelGEMINI GLP 30
CategoryScissor Lifts
LanguageEnglish

Related product manuals