31
MAINTENANCE BOOK
INITIAL TEST
Floor consistency check
1
DESCRIPTION TEST
N.
YES
NO
Notes
Safety distances check (from walls, columns,
ceiling, other machines etc.)
2
Power supply line check.
3
Lift levelling check.
4
Lift working check.
5
Loaded lift check.
6
Lift fixing check.
7
Oil level check.
8
Hydraulic failure check.
9
Operating instruction
10
NOTES:
Client
Stamp and signature
Installer
Stamp and signature
Date Next test on:
KONTROLL AV GOLVETS BELASTBARHET
1
BESKRIVNING AV TEST
Nr.
JA
NEJ
ANM.
KONTROLL AV AVSTÅND MELLAN LYFT, VÄGGAR,
TAK, ANDRA MASKINER OCH LIKNANDE
2
KONTROLL AV ELANSLUTNING
3
KONTROLL AV ATT LYFTPLATTORNA
LYFTER PARALLELLT
4
FUNKTIONSKONTROLL AV LYFTEN
5
FUNKTIONSKONTROLL MED BELASTNING
6
KONTROLL AV LYFTENS FASTSÄTTNING
7
KONTROLL AV OLJENIVÅ
8
KONTROLL AV TÄTHET I OLJEKRETSEN
9
BRUKSANVISNING
10
UNDERHÅLLSINSTRUKTIONER
KONTROLL EFTER MONTERING
NOTERINGAR:
Kund:
Stämpel och underskrift
Installatör:
Stämpel och underskrift
Datum Nästa test skall göras: