Lift maintenance and cleaning check.
1
TEST DESCRIPTION
N.
YES
NO
Notes
Oil level check.
2
Rollers slides greasing.
3
Movable parts greasing.
4
High pressure flexible pipes check.
5
Hydraulic failure check.
6
Lift levelling check.
7
Loaded lift check.
8
Result of visit
Positive
Negative
PERIODICAL OR OCCASIONAL VISIT
NOTES:
Client
Stamp and signature
Installer
Stamp and signature
Date Next test on
Kontroll av lyftens underhåll och renhet
1
BESKRIVNING AV TEST
Nr.
JA
NEJ
ANM.
Kontroll av oljenivån
2
Kontroll av infettning utav rullarnas glidytor
3
Kontroll av infettning utav alla rörliga delar
4
Kontroll av hydraulslangarnas skick
5
Kontroll av täthet i hydraulkretsen
6
Kontroll av att lyftplattorna höjer sig parallellt
7
Belastningskontroll
8
Resultat av kontroll
positiv
negativ
PERIODISK KONTROLL
NOTERINGAR:
Kund:
Stämpel och underskrift
Installatör:
Stämpel och underskrift
Datum Datum för nästa kontroll:

Other manuals for Rotary GEMINI GLP 30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotary GEMINI GLP 30 and is the answer not in the manual?

Rotary GEMINI GLP 30 Specifications

General IconGeneral
BrandRotary
ModelGEMINI GLP 30
CategoryScissor Lifts
LanguageEnglish

Related product manuals