EasyManuals Logo

Ruijie Reyee RG-RAP2200 User Manual

Ruijie Reyee RG-RAP2200
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Hardware Installation and Reference Guide Preparing for Installation
7
The amount of salt, acids and sulfides in the air are also strictly limited for the equipment room. These substances can
accelerate metal corrosion and aging of some parts. Table 2-3 describes the limits of some hazardous gases such as SO
2
,
H
2
S, NO
2
and Cl
2
in the equipment room.
Table 2-3
Gas
Average (mg/m
3
)
Maximum (mg/m
3
)
SO
2
0.2
1.5
H
2
S
0.006
0.03
NO
2
0.04
0.15
NH
3
0.05
0.15
Cl
2
0.01
0.3
2.7 Power Supply
DC power adapter:
Input voltage: 12V
Rated current: 1.5A
PoE+ injector: IEEE 802.3af/802.3at compliant
Technical Specifications of the DC Connector
Inner Diameter
Outer Diameter
Insertion
Depth
Conductor
Impedance
Voltage-
endurance
Impedance
Voltage-
endurance
(Insulator and
Conductor)
Polarity
2.10+/-0.05mm
5.50+/-0.05mm
9mm
5Ω
100MΩ
1000V
Inner
pole:
positive
Outer
pole:
negative
The DC input power should be greater than the power actually consumed by the system.
Use DC power adapters with specifications recommended by Ruijie.
Please use Ruijie certified PoE injectors.
2.8 Installation Tools
Common Tools
Phillips (crosshead) screwdriver, copper and fiber cables, bolts, diagonal pliers, cable ties
Special Tools
Wire stripper, crimping pliers, RJ-45 crimping pliers, punch down tool
Meter
Multimeter, bit error rate tester (BERT)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie Reyee RG-RAP2200 and is the answer not in the manual?

Ruijie Reyee RG-RAP2200 Specifications

General IconGeneral
BrandRuijie
ModelReyee RG-RAP2200
CategoryWireless Access Point
LanguageEnglish

Related product manuals