Hardware Installation and Reference Guide Installing the Access Point
11
3. Extend the cables under the AP and run in a straight line.
3.8 Checking after Installation
Checking the Cabinet
Make sure the external power supply matches the patch panel specifications for the cabinet.
After installation, make sure that the front and rear cabinet doors easily close.
Make sure the cabinet is stable and level.
Make sure the device and all cables are securely fastened in the rack.
Checking Cable Connection
Make sure the UTP/STP cable matches the interface type.
Make sure cables are properly bundled.
Checking the Power Supply
Make sure all power cables are properly connected and safe.
Make sure the AP is operational after powering on.