MODEL 63504-F63C1/63604-F63C3/73504-F68C1/73604-F68C3
13
Install drain pipeline
a.As the Figure 1-4 shows, slide the drain hose connector into drain
outlet.
b.Insert drain line flow control into drain outlet
c.Screw drain hose connector into drain outlet, and lock it.
d.Locate the drain hose well as the Figure1-4 show.
Note:
Control valve should be higher than drain outlet, and be better not far
from the drain hose.
Be sure not connect drain with sewer, and leave a certain space
between them, avoid wastewater be absorbing to the water treatment
equipment, such as showed in the Figure1-4.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Runxin F63C3 and is the answer not in the manual?

Runxin F63C3 Specifications

General IconGeneral
BrandRunxin
ModelF63C3
CategoryControl Unit
LanguageEnglish

Related product manuals