EasyManua.ls Logo

Salamander Pumps CT FORCE 20 SU - Step 3: Electrical installation

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Step 3: Electrical installation
Your pump must be connected to the electrical supply using the main cable with the
attached plug. This plug must be connected to an accessible socket that has been installed in
compliance with IET Wiring Regulations.
The plug must be accessible at all times.
If the supply cord is damaged, it must be replaced by the manufacturer, it’s service agent,
or similarly qualified person in order to avoid a hazard.
All pipe work must be cross-bonded in accordance with the IET Regulations.
The pump is supplied with a fuse fitted. Higher rate fuses MUST NOT be used.
If installed by a Part P qualified installer, the pump may be fitted via a fused mains spur
without invalidating the warranty. See Technical Specifications for fuse ratings for each
model of pump. Ensure that the pump is fully operational before hard wiring pump in this
instance, this should be done during commissioning.

Related product manuals