EasyManua.ls Logo

Samsung AM TNVD Series - Unit Placement and Maintenance Safety; Outdoor Unit Placement and Ventilation; Water Entry and Self-Repair Warning; Indoor Unit Placement Caution

Samsung AM TNVD Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
English
Installation Procedure
Step 11 Connecting the power and
communication cables
1 Before wiring work, you must turn off all power source.
2 Indoor unit power should be supplied through the breaker
(ELCB or MCCB+ELB) separated by the outdoor power.
ELCB:Earth Leakage Circuit Breaker
MCCB:Molded Case Circuit Breaker
ELB:Earth Leakage Breaker
3 The power cable should be used only copper wires.
4 Connect the power cable (1(L), 2(N)) among the units
within maximum length and communication cable (F1,
F2) each.
5 Connect F3, F4(for communication) wires at the back side of the indoor unit when installing the wired remote
control.
V1F11(L) 2(N) F2
F11(L) 2(N) 1(L) 2(N)F2
F1 F2
F1 F2
F1 F2 F1 F2 N L
N L
N L N L
F1 F2 1(L) 2(N) F1 F2
F11(L) 2(N) F2F11(L) 2(N) F2 V2 F3 F4
F1 F2
F3 F4
Outdoor Unit
Indoor Unit 1
Indoor Unit 4 Indoor Unit 5 Indoor Unit 6
Indoor Unit 2 Indoor Unit 3
EEV kit
220-240 V~or
MCCB+
ELB
ELCB
Wired Remote
Control
Ceiling, wall-mounted indoor unit.
ELCB : Essential Installation
The EEV Kit is optional component.
WARNING
Power off before connecting any wires;Indoor PBA will be damaged while V1, V2, F3, F4 short each other.
You must connect the earth cable. If earthing is not complete, electric shock or fire may occur.
DB68-08953A-00_IM_DVM QMD_EU_EN_.indd 11 2020-02-10 오후 4:23:07

Other manuals for Samsung AM TNVD Series

Related product manuals