EasyManua.ls Logo

Samsung AM TNVD Series - Step 14 Performing the Final Check; Step 15 Providing Information for User

Samsung AM TNVD Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
English
Installation Procedure
Step 14 Performing the final check
To complete the installation, perform the following checks
and tests to ensure that the air conditioner operates correctly.
1 Check the following:
Strength of the installation site
Tightness of pipe connection to detect gas leak
Electric wiring connection
Heat-resistant insulation of the pipe
Drainage
Grounding conductor connection
Correct operation (follow the steps below)
2 Press the
button and check the following:
The indicator on the indoor unit lights up.
The airflow blade opens and the fan gears up for
operation.
3 Press any button and check the following:
The appropriate indicator lights up and the air
conditioner operates according to the selected
mode or function.
4 Press the
button and check the following:
The airflow blades work properly.
5 Press the
button and check the following:
The airflow blades work properly.
NOTE
The button is only for Wind-Free models.
Step 15 Providing information for user
After finishing the installation of the air conditioner, you
should explain the following to the user. Refer to appropriate
pages in the user & installation manual.
1 How to start and stop the air conditioner
2 How to select the modes and functions
3 How to adjust the temperature and fan speed
4 How to adjust the airflow direction
5 How to set the timers
6 How to clean and replace the filters
NOTE
When you complete the installation successfully, hand
over the user & installation manual to the user for
storage in a handy and safe place.
DB68-08953A-00_IM_DVM QMD_EU_EN_.indd 31 2020-02-10 오후 4:23:12

Other manuals for Samsung AM TNVD Series

Related product manuals