Base construction and installation of the outdoor unit
Examples of draining work
AͱϑϩθЇʀϩϩ˵ʪʒθɇɇ˝ʪʒϩʀ˵иϩ˵θʪ˙ͱθʀʪʒʀͱʀθʪϩʪϑɇʒɇʪϑЇθʪϩ˵ɇϩиɇϩʪθࣛΧθͱͱѣ˝иͱθϑʒͱʪ
For smooth draining of defrost water, make sure to apply 1/50 slope.
Construct a drainage around the outdoor unit to prevent the defrost water (from the outdoor unit) from
ϑϩɇ˝ɇϩ˝ࡥͱЭʪθѤͱи˝ͱθ˙θʪʪі˝ʪɇθϩ˵ʪϑϩɇɇϩͱϑΧɇʀʪ
When the outdoor unit is installed on the roof, check the strength and waterproof status of the roof.
(Unit : mm)
960
760
100
80
80
80
ߨߢঌ
100
X
X’
Direction of the
drainage (Slope 1/50)
<Drainage work for single installation>
B
A
50
100
150 100
<X-X’ SECTION>
80
80
80
80
80
80
80
80
ߨߢঌ
ߨߢঌ
200
BB
200
Direction of the drainage
(Slope 1/50)
<Drainage work for module installation>
(Unit : mm)
Aɇϑϑѣʀɇϩͱ DVM S Small Type DVM S Large A Type DVM S Large B type
A 940 1,350 1,350
B 740 1,150 1,150