EasyManua.ls Logo

Samsung AM240MXVGNR/ET - Things to Check after Completing the Installation

Samsung AM240MXVGNR/ET
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110
Things to check after completing the installation
1. Before supplying the power, use DC 500 V insulation resistance tester to measure the power (3 phase: R, S, T/
1 phase: L, N) terminal and the outdoor unit grounding.
đʪɇϑЇθʪʪϩϑ˵ͱЇʒɵʪͱЭʪθߥߢđצ࢏
2. Before supplying the power, use a voltmeter and phase tester to check the voltage and the phase.
ŵࡥƊࡥƟࡥĘϩʪθɇࡤʀ˵ʪʀ˙ϩ˵ʪЭͱϩɇ˝ʪϑиϩ˵ߥߪߢࣛߦߣߧǤɵʪϩиʪʪиθʪϑ࣑ŵࣛƊࡥƊࣛƟࡥƟࣛŵ࣒ɇʒߤߢߢࣛߤߦߢǤ
between phases (R-N, S-N, T-N) before turning on the switch.
࡛Never measure the communication terminal since communication circuit may get damaged.
࡛Check for short-circuit of the communication terminal with a general circuit tester.
CAUTION
N
T
S
R
< ELB >
230V
400V400V
400V
230V 230V
3. Check if the R-410A indoor units are connected.
4. When N phase is not correctly connected to R, S and T phase, over-voltage protection control will be in
effect and it will cut-off the power of the PCB. Check the power cable connection of the N phase if the PCB
is not turned on.
5. Check the following after the installation is completed.
Installation work
Outdoor unit
࡛Have you checked the external surface and the inside of the outdoor
unit?
࡛Is there any possibility of short-circuit caused by the heat of an
outdoor unit?
࡛Is the place well-ventilated and ensures space for service?
࡛Ãϑϩ˵ʪͱЇϩʒͱͱθЇϩѣуʪʒϑʪʀЇθʪцϩͱиϩ˵ϑϩɇʒɇцʪуϩʪθɇ˙ͱθʀʪ࢐
Indoor unit
࡛ Have you checked the external surface and the inside of the indoor unit?
࡛Is there enough space for service?
࡛Have you checked if the center of the indoor unit is ensured and it is
installed horizontally?
Refrigerant pipe work
࡛Have you selected correct pipes?
࡛Are the liquid and gas valve open?
࡛Is the total number of connected indoor units within the allowable
range?
࡛Are the length and the height difference between the refrigerant
pipes within the allowable range?
࡛Are the branch joints properly installed?
࡛Did you check the connection of liquid and gas pipes?
࡛Have you selected correct insulator for pipes and insulated them
correctly?
࡛Did you insulate the pipes and connection part correctly?
࡛Is the quantity of the additional refrigerant correctly weighed
in? (You must record the amount of additional refrigerant on the
service record paper placed inside of the outdoor unit.)

Other manuals for Samsung AM240MXVGNR/ET

Related product manuals