EasyManua.ls Logo

Sapling SBP Series - Wall Mounted Clock Mechanical Installation Options; Option 1: Installing to a Double Gang Box; Option 2: Installing Using Keyholes

Sapling SBP Series
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
1
2
3
Wall Mounted Clock Mechanical Installation
2) When installing the clock housing to a double
gang box, leave at least 4 inches between the
top of the gang box and ceiling. Confirm that the
bottom of the gang box is level with the floor.
1) The digital clock surface (wall) mount housing is
designed with numerous holes for the purpose of
fixating it to the wall. There are two ways to mount
the clock housing to the wall. Option one (the most
common way) is to screw the digital clock housing
to a double gang box, while the second option is to
utilize its keyhole mounting holes.
Ceiling
4” (10.16 cm) Minimum
3) Run the network cable to the gang box.
Wall
Option 1:
Installing to a
double gang box
(go to step 2)
Option 2:
Installing using
keyholes
(go to step 5A)

Related product manuals