EasyManua.ls Logo

Sapling SBP Series - Page 27

Sapling SBP Series
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Preparing for the Dual-Faced Installation
The mounting pole has been designed to be installed on a double gang box, which will hold the mounting
pole and the dual-faced clocks. As such, to install a dual-faced clock, there is a need to have the double
gang box fixated and secured to the ceiling and/or to the wall and have the network cable pre-wired and
ready to be connected to the clock.
If any of the items listed in the kit are missing, you may contact your dealer and order a replacement kit.
Dual-Faced / Flag Mounted Clock Mechanical Installation
#6-19x7/16 Phillips round head
black screw (not used in this
configuration)
#6-32x5/16 Phillips round head
silver screw (not used in this
configuration)
#6 Internal-tooth lock washer
(not used in this configuration)
10
6
6
If not mounting the clock to a double gang box, the installer needs to provide:
#8 self-tapping screws
Wall anchors
4
4

Related product manuals