Chapter III Preparation for Installation
3.1 Unpacking
- Open the packing case, remove the surrounding packing materials, inspect the machine for damage during
transportation, and inspect the main components and accessories for completeness as per the packing list. Keep
packing materials away from children so as not to pose any danger, and properly dispose them if they may cause
pollution.
3.2 Foundation
- The user has a responsibility to ensure the stability of the foundation. The concrete shall have a minimum thickness
of 500mm and a minimum strength of 21MPa, and shall be properly prepared 15 days prior to the installation date. No
other foundation equipment is allowed within 350mm of the expansion bolt to avoid degrading the foundation strength.
The user has a responsibility to provide safe power, air source, and such connecting components as power wire.
3.3 Tools
a. 5m tape
b. Chalk
c. Proper impact drill and bit (expansion bolt M18X160mm)
d. Hammer
e. Proper wrench
f. 1.2m spirit level
g. Crowbar
h. 4m ladder
i. Proper screwdriver
j. 100mmx100mm woodwork (for laying the post flat to protect the paint surface)